Overview

Creative air source heat pump installation reduces utility waste and resident discomfort 

  • $30,000
    Project Cost:
  • 604,800 gallons of water
    Annual Utility Savings
  • $7,000
    Annual Utility Cost Savings
  • 4.3 years
    Simple Payback
  • 2.8
    Savings to Investment Ratio
  •  

Project Achievements

After successfully reducing its source energy use by 15% in the NYSERDA Multifamily Performance Program, The Charlton House—a 176-unit multifamily building located in Lower Manhattan—again engaged EN-POWER GROUP to upgrade its old, inefficient water source heat pump that struggled to properly heat and cool the lobby area. In addition to increasing comfort, EN-POWER GROUP aimed to improve the system’s efficiency, eliminate high water bills, and streamline operation and maintenance (O&M) procedures by providing a solution that involved minimal construction.

The Charlton House’s lobby had its own dedicated water source heat pump for cooling and heating. However, the system was not equipped with a heat-rejecting absorption medium (e.g., cooling tower or condenser water loop); instead, it used municipal water that was then directly discarded. This system racked up significant water bills and also struggled to reach desired temperature setpoints, creating resident discomfort and O&M difficulties.

EN-POWER GROUP chose a ceiling-concealed horizontal ducted unit that could be used with the lobby’s existing register. In addition, we utilized the existing borehole created for the water lines of the original system to run the refrigerant and condensate drain lines for the new unit. This creative adaptation of the existing infrastructure minimized on-site construction work and reduced disturbance to residents.

Beyond design services, EN-POWER GROUP also provided project management services, including coordinating between property staff and contractors, filing for permits, overseeing the installation process, and commissioning the equipment to ensure it performed as intended.

Related Projects

Energy Management & Controls

Energy Modeling

Engineering Design and Implementation

Rebates And Financing

Mechanical System

The Victoria’s Practical Path to $0 Project LL97 Penalties

Energy Management & Controls

Energy Modeling

Engineering Design and Implementation

Rebates And Financing

Mechanical System

The Victoria’s Practical Path to $0 Project LL97 Penalties

Energy Management & Controls

Energy Modeling

Engineering Design and Implementation

Rebates And Financing

Mechanical System

The Victoria’s Practical Path to $0 Project LL97 Penalties

Get In Touch